Flow chart for shear probes: Difference between revisions

From Atomix
Aleboyer (talk | contribs)
No edit summary
Aleboyer (talk | contribs)
Line 81: Line 81:
==      Apply [[Shear_probes_quality_control_metrics|quality-control metrics]] ==
==      Apply [[Shear_probes_quality_control_metrics|quality-control metrics]] ==


<div class="mw-collapsible" id="quality_control" data-collapsetext="Collapse" data-expandtext="Expand">
<div class="mw-collapsible mw-collapsed" id="quality_control" data-collapsetext="Collapse" data-expandtext="Expand">
<br>
<br>
Shear-probe data can be corrupted or compromised in several different ways.
Shear-probe data can be corrupted or compromised in several different ways.

Revision as of 18:15, 6 June 2024

The processing of shear-probe data can be divided into five major steps, which apply to data collected with any platform or vehicle. There are many sub-steps to these major steps. The major steps are:

Conversion to physical units


"Section" selection

Choosing the processing parameters

Compute the dissipation rate estimates

Apply quality-control metrics


Return to Shear Probe Welcome Page